Scroll down for screenshot description

Material Control - Expediting Variance Report

Expediting Variance Report

This report shows, for each PO Item, its required on site date, its promised or current delivery time, and any variances between those two dates taking into account the current print or system date.

Expediting Reports can be viewed in detail or summarized with a multitude of filtering choices allowing one to drill down to very specific data.

 

Copyright© 2007 OnTrack Engineering Ltd. All rights reserved.