Scroll down for screenshot description
The summary cost report can be sorted by nine (9) different work breakdown structures, in short or long versions and on standard or legal paper. This multiple breakdown structure allows each interested party to view the cost report in their own format. For example, the client will look at the cost report by their AFE code, the Engineer by item, and the construction manager will view it by cost type since it details construction packages and summarizes material and engineering.
Copyright© 2007 OnTrack Engineering Ltd. All rights reserved.